Timeline & Testing
Kevin’s development builds on the proven systems and design of Noodle while incorporating additional hardware and structural changes for the 2026 RobotX Maritime Challenge. The vehicle is developed through an iterative process in which the frame, electronics, propulsion, sensing, communications, waterproofing, and payload systems are integrated and tested as the design evolves.
Testing progresses from individual components and subsystems to integrated flight operations. Testing includes electrical and propulsion checks, communications and sensor verification, waterproofing, flight testing, and evaluation of the tin-retrieval mechanism. Each stage allows the team to identify issues, validate design decisions, and refine Kevin for competition.
Design decisions are validated through a combination of subsystem testing, integration testing, and flight testing. Particular attention is given to flight stability, propulsion, battery performance, communications, sensing, waterproofing, and payload operation. As development continues, the team documents test objectives, procedures, results, and design changes to track Kevin’s readiness for RobotX 2026.
Explore Timeline & Testing →